Author

  • Muhammad Usman Tariq

    • Shaheed Zulfikar Ali Bhutto Institute of Science and Technology (SZABIST), Islamabad, Pakistan
    • Pakistan
  • Muhammad Naeem Ahmed Khan

    • Shaheed Zulfikar Ali Bhutto Institute of Science and Technology (SZABIST), Islamabad, Pakistan
    • Pakistan

Abstract

Six Sigma being a project management methodology is used in the industries and corporate sectors to substantiate goal of near perfection in process implementation and execution. It is based on the impetus of Plan-Do-Check-Act and has myriads of applications in numerous organizational and business processes to attain significant performance improvement in different industrial and corporate sectors including the IT sector. Despite realization of profuse maturity in many business processes, Six Sigma still lacks across-theboard framework for effective risk management because root cause analysis (RCA) is still the primary and principal technique used for handling risks in this methodology. In this paper, we have attempted to put forward a risk identification framework in order to improve quality and productivity of Six Sigma projects, particularly the IT development projects. The study also encompasses an abridged overview of the current methods being practiced for risk identification in Six Sigma. Our proposed model enlist a number of hypotheses for validation purposes and is duly evaluated and analyzed viz-à-viz DMAIC and DMADV approaches to make it compatible with QFD, FMEA and PMBOK requirements.

Keywords

References

  • > Alhawari, S., Thabtah, F., Karadsheh, L. & Hadi, W. M. (2008). A Risk Management Model for Project Execution. In proceedings of the 9th International Business Information Management Association Conference (IBIMA), Conference on Information Management in Modern Organizations: Trends & Challenges, 887-893, January 4–6, Marrakech, Morocco.
  • Azizi, N. & Hashim, K. (2008). Enterprise Level IT Risk Management. Proceedings of the 8th WSEAS International Conference on APPLIED COMPUTER SCIENCE (ACS'08).
  • Benedikt, M. & Frank, T. (2009). Why risk management matters in it outsourcing – a systematic literature review and elements of a research agenda, 17th European Conference on Information Systems, 2009.
  • Deng, X. & Ma, Z. (2008). Research on risk management of large-scale software project based on consumer’s demand”, Proceedings of the 38th International Conference on Computers and Industrial Engineering, Oct.31-Nov.2, 2008, Beijing, China.
  • De-Feo, J. A. & Barnard, W. W. (2005). Juran Institute's Six-Sigma Breakthrough and Beyond: Quality Performance Breakthrough Methods. Tata McGraw-Hill Publishing Company Limited. ISBN 0-07059881-9.
  • Park, Y., Choi, H. & Baik, J. (2007). A Framework for the Use of Six Sigma Tools in PSP/TSP, sera, pp.807-814, 5th ACIS International Conference on Software Engineering Research, Management & Applications (SERA 2007), 2007.
  • Racz, N., Weippl, E. & Seufert, A. (2010). A process model for integrated IT governance, risk, and compliance management. In: J. Barzdins & M. Kirikova (eds.), Databases and Information Systems. Proceedings of the Ninth International Baltic Conference, Baltic DB&IS 2010. Riga: University of Latvia Press, pp. 155-170.
  • Rath, M. & Sponholz, R. (2009). IT-Compliance: Erfolgreiches Management regulatorischer Anforderungen, Schmidt, Berlin
  • Rovai, R. L., Rodrigues, L. C. & Campanario, M. A. (2006). Strategic Model for Risk Evaluation in Project Management. IAMOT 2006.
  • Santos, D. & Cabral, S. (2008). FMEA and PMBOK applied to project risk management. Journal of Information Systems and Technology Management , 5(2), 347-364.
  • Seyedhoseini, S. M. & Hatefi, M. A. (2009). Two-Pillar Risk Management (TPRM): AGeneric Project Risk Management Process. Transaction E: Industrial Engineering ,16(2), 138-148, 2009.
  • Zhang, W., Hill, A. V. & Gilbreath, G. H. (2009). Six Sigma: A Retrospective and Prospective Study. , POMS 20th Annual Conference, Orlando, Florida U.S.A. ,May 1 to May 4, 2009.

Downloads

No downloads have been recorded for this article yet. Figures appear here once readers begin downloading the full text.

How to Cite

Tariq, M. U., & Khan, M. N. A. (2012). Six Sigma based Risk Identification and Mitigation Framework for Projects Execution. Information Management and Business Review, 4(2), 79-85. https://doi.org/10.22610/imbr.v4i2.967

Share this article

Section

Research Paper

Published

2012-02-15

Submissions

Have research to publish? Information Management and Business Review welcomes submissions.

Make a Submission