Author

  • Saiful Azmir Bin Kasdi Abd Rahim

    • Faculty of Business and Management, Universiti Teknologi MARA, Malaysia
    • Malaysia
  • Mohd Hafiz bin Zulfakar

    • Faculty of Business and Management, Universiti Teknologi MARA, Malaysia
    • Malaysia
  • Rumaizah Binti Ruslan

    • Faculty of Business and Technology, Universiti Tun Hussein Onn, Malaysia
    • Malaysia

Abstract

The study aims to identify and analyze the reason for the project delay in ABC Company located in the heart of Malaysia specializing in oil and gas and oil and gas-related products. The study utilized observation techniques and data from an official report. The observation was done on an ongoing project and the assessment of record was done on previously completed projects. The outcome of such observation was analysed and simplified using a tool namely the Cause and Effect Diagram or Fishbone Diagram. The study found that shortage of manpower, local authority approval, improper planning, and the COVID-19 pandemic as the root causes that led to project delay.

Keywords

References

Downloads

Full-text downloads recorded for this article, by month.

No downloads have been recorded for this article yet. Figures appear here once readers begin downloading the full text.

How to Cite

Bin Kasdi Abd Rahim, S. A., bin Zulfakar, M. H., & Binti Ruslan, R. (2024). Determining the Root Causes of Project Delay: A Case Study. Information Management and Business Review, 16(3S(I)a), 39-45. https://doi.org/10.22610/imbr.v16i3S(I)a.4120

Share this article

Section

Research Paper

Published

2024-10-27