Author

  • Houda TAHRI

    • IMOSYS – EMI, Morocco
    • Morocco

Abstract

The assurance of a good project tracking from the analysis of his opportunity until its realization is the basic condition for its success. This tracking requires making available, the project manager or PMO, of a variety of tools that support the managerial activity and optimize the time available to management. The purpose of this study is to define a project management system that integrates twelve management functionalities (planning, project portfolio management, Content Management, collaboration platform, issues management, deliverables management, resource management, Change management, Configuration management, Workflow Management, Electronic document management and Satisfaction surveys). Thus, final system will integrate, in addition to the key features found in existing project management software, five additional functionalities and a specific additional module of portfolio management to support multi-criteria analysis projects and maturity assessment of project management.

Keywords

References

  • Blair, S. (2004). A Guide to Evaluating a Bug Tracking System”. Retrieved from Scribd.com: http://www.scribd.com/doc/7046090/A-Guide-to-Evaluating-a-BugTracking-System
  • Elliot, M. A. (2007). Stigmergic collaboration - A theoretical framework for mass collaboration. Melbourne, Centre for Ideas - Victorian College of the Arts, The University of Melbourne, 240 p.
  • Gartner. (2015a). Magic Quadrant for Cloud-Based IT Project and Portfolio Management Services, Worldwide. Gartner. (2015b). Magic Quadrant for IT Project and Portfolio Management Software Applications, Worldwide.
  • PMI. (2013). A Guide to the Project Management Body of Knowledge (PMBOK Guide) . Fifth Edition, p 8-10.
  • Ricardo, C. (2005). The impact of project portfolio management on information technology projects. International Journal of Project Management , 23(7), 524–537.

Downloads

No downloads have been recorded for this article yet. Figures appear here once readers begin downloading the full text.

How to Cite

TAHRI, H. (2015). Designing a Project Management Integrated System. Information Management and Business Review, 7(6), 6-10. https://doi.org/10.22610/imbr.v7i6.1177

Share this article

Section

Research Paper

Published

2015-12-30

Submissions

Have research to publish? Information Management and Business Review welcomes submissions.

Make a Submission