Abstract
The success of the Government's construction projects in the Democratic Republic of Congo (DRC) since 2011 has been anchored on the potential of construction firms in completing these projects based on the planned timeframe as well as the budget. Consequently, from a project management viewpoint, the main objective of the present study was to assess the critical success factors in developing countries' construction projects and to examine the impact of risk management, leadership, experience and expertise, and project size on construction projects in DRC. Data was gathered from respondents in the construction projects in DRC using quantitative methods. A statistical software program, SPSS version 25, was subsequently used to analyze the collected quantitative data. The findings emanating from this study contribute to the body of knowledge on key success factors in construction projects in DRC as a developing country. It was revealed from the study that the success of construction projects in DRC could be boosted through effective and efficient risk management. In addition, effective and efficient leadership mainly transactional leadership would affect construction project success. Further, the more the experience and expertise of construction project staff, the more likely the project success criteria would be met, and the more likely the project would be successful. And lastly, smaller-sized and medium-sized construction projects may be more successful, whereas mega projects may not be very successful due to insufficient and limited experience and expertise.
Keywords
- Critical Success Factors Search this journal for Critical Success Factors (opens in a new tab)
- Developing Country Search this journal for Developing Country (opens in a new tab)
- Least Developed Countries Search this journal for Least Developed Countries (opens in a new tab)
- Project Success Search this journal for Project Success (opens in a new tab)
- Quality Search this journal for Quality (opens in a new tab)
References
- Abbas, A., Din, Z. U. & Farooqui, R. (2016). Achieving greater project success & profitability through preconstruction planning: A case-based study, Procedia Engineering, 145(1), 804-811.
- Adams, J., Khan, H. T. & Raeside, R. (2014). Research methods for graduate business and social science students. 2nd Ed. New Delhi: Sage.
- Adeer, H. J., Mellenbergh, G. J. & Hand, D. J. (2011). Advising on research methods: A consultant's companion. Huizen: Johannes van Kessel Publishing.
- Afolabi, A., Ibem, E., Aduwo, E., Tunji-Olayeni, P. & Oluwunmi, O. (2019). Critical Success Factors (CSFs) for eProcurement Adoption in the Nigerian Construction Industry. Buildings, 9(2), 47-65.
- ANAPI. (2016). Major projects awaiting fundings - DR Congo National Investment Promotion Agency. [Online] Investindrc.cd. Available at: https://www.investindrc.cd/en/investment-guide/major-projectsawaiting-fundings [Accessed 23 Dec. 2018].
- Alashwal, A., Fareed, N. & Al-Obaidi, K. (2017). Determining success criteria and success factors for international construction projects for Malaysian contractors, Construction Economics & Building, 17(2), 62-80.
- Alias, Z., Zawawi, E., Yusof, K. & Aris, N. (2014). Determining critical success factors of project management practice: A conceptual framework. Procedia - Social and Behavioral Sciences, 153(1), 61-69.
- Aneesha, K. & Haridharan, M. K. (2017). Ranking the project management success factors for construction projects in South India, in IOP Conference Series: Earth and Environmental Science.
- Akeke, N. I., Akeke, A. R. & Awolusi, O. D. (2015). The Effect of job satisfaction on organizational commitment among the non-academic staff of tertiary institutions in Ekiti State, Nigeria, International Journal of Interdisciplinary Research Method, 2(1), 25–39.
- Araszkiewicz, K. (2015). Application of critical chain management in construction projects schedules in a multi-project environment: A case study, Procedia Engineering, 182(1), 33-41.
- Aritz, J. & Walker, R. (2014). Leadership styles in multicultural groups: Americans and East Asians working together. Journal of Business Communication, 51(1), 72-92.
- Awolusi, O. D. (2012). The effects of mergers and acquisitions on Business Performance in the Nigerian banking industry: an empirical analysis, International Journal of Business Performance Management, 13(3/4), 366–385.
- Awolusi, O. D. (2021). Economic Growth and Socioeconomic Sustainability in BRICS Countries: A Vector Error Correction Modeling Approach, Journal of Economics and Behavioral Studies, 13(3), 1-23.
- Babbie, E. R. (2014). The practice of social research. 14th ed. Australia: South-Western.
- Babalola, H. & Ojo, O. (2016). An Investigation into Factors Affecting the Performance of Public Construction Projects in Ondo State, Southwestern, Nigeria. Civil and Environmental Research, 8(1), 72-79.
- Banihashemi, S., Hosseini, M., Golizadeh, H. & Sankaran, S. (2017). Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries, International Journal of Project Management, 35(6), 1103-1119.
- Barnes, M. (1988). Construction project management (Book Review), Construction Management & Economics, 4(1), 81-97.
- Baron, L. & Parent, E. (2015). Developing authentic leadership within a training context: Three phenomena supporting the individual development process. Journal of Leadership & Organizational Studies, 22(1), 37-53.
- Belay, A. M. & Torp, O. (2017). Do Longer Projects Have Larger Cost Deviation Than Shorter Construction Projects? Procedia Engineering, 196(1), 262-269.
- Brace, I. (2008). Questionnaire design: How to plan, structure and write survey material for effective market research. 2nd ed. London: Kogan Page Publishers.
- Damoa, I. S., Akwei, C. & Mouzughi, A. (2015). Causes of government project failure in developing countries – Focus on Ghana. British Academy of Management.
- Doulabi, R. Z. & Asnaashari, E. (2016). Identifying success factors of healthcare facility construction projects in Iran, Procedia Engineering, 164(1), 409-415.
- Das, D. & Ngacho, C. (2017). Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya, IIMB Management Review, 29(1), 276-293.
- Ceric, A. (2013). The Principal-Agent Theory and the Role of Project Managers in Construction: Guidelines for Future Research. [Online] Irbnet.de. Available at: http://www.irbnet.de/daten/iconda/CIB_DC25687.pdf [Accessed 23 Feb. 2019].
- Chikere, C. C. & Nwoka, J. (2015). The systems theory of management in modern-day organizations - A study of Aldgate Congress Resort Limited Port Harcourt, International Journal of Scientific and Research Publications, 5(9), 1-7.
- Chepkemoi, J. (2018). The Largest Countries in Africa by Land Area. [Online] WorldAtlas. Available at: https://www.worldatlas.com/articles/which-are-the-10-largest-countries-of-africa-by-size.html [Accessed 24 May 2019].
- Cheong Yong, Y. & Emma Mustaffa, N. (2012). Analysis of factors critical to construction project success in Malaysia. Engineering, Construction and Architectural Management, 19(5), 543-556.
- Clowes, W. (2018). Bloomberg -. [Online] Bloomberg.com. Available at: https://www.bloomberg.com/news/articles/2018-06-13/congo-plans-to-start-13-9-billionhydropower-project-this-year [Accessed 2 May 2019].
- Cohen, L., Manion, L. & Morrison, K. (2011). Research methods in education. 7th ed. London: Routledge.
- Collis, J. & Hussey, R. (2003). Business Research: A practical guide for undergraduate and postgraduate students. New York, USA: Palgrave Macmillan.
- Crawford, L. (2000). Profiling the competent project manager, in Project management research at the turn of the Millenium. Paris, France: Project Management Institute. Available at: https://www.pmi.org/learning/library/profiling-competent-project-manager-8524 [Accessed: 10 July 2018].
- Edwards, R. & Holland, J. (2013). What is qualitative interviewing? 1st ed. London: Bloomsbury Publishing Plc.
- El-Karim, M. S., El Nawawy, O. A. & Abdel-Alim, A. M. (2017). Identification and assessment of risk factors affecting construction projects, HBRC Journal, 13(1), 202-216.
- Easterby-Smith, M., Thorpe, R. & Jackson, P. (2012). Management Research, 4th edition, London: SAGE Publications.
- Field, A. (2009). Discovering statistics using SPSS. London: SAGE.
- Giltinane, L. (2013). Leadership styles and theories. Nursing Standard, 27(41), 35-39.
- Gunduz, M. & Yahya, A. M. A. (2015). Analysis of project success factors in the construction industry, Technological and Economic Development of Economy, 24(1), 67-80.
- Hattangadi, V. (2016). Historical and contemporary theories of management, International Journal of Business and Management Invention, 5(10), 48-53.
- Hosny, H. E., Ibrahim, A. H. & Fraig, R. F. (2018). Risk management framework for continuous flight auger piles construction in Egypt, Alexandria Engineering Journal, 57(1), 2667-2677.
- Ibm.com. (2019). SPSS software. IBM Corporation. [Online] Available at: http://www.ibm.com/analytics/us/en/technology/spss/ [Accessed 23 Jan. 2019].
- Iram, N., Khan, B. & Sheran, A. W. (2016). Critical factors influencing the project success: An analysis of projects in manufacturing and construction in Pakistan. Arabian Journal of Business and Management Review (Oman Chapter), 6(2), 234-245.
- Joo, B. & Nimon, K. (2014). Two of a kind? A canonical correlational study of transformational leadership and authentic leadership. European Journal of Training & Development, 38(6), 570-587.
- Kogan, N. & Lee, K. J. (2014). Exploratory research on success factors and challenges of smart city projects. Asia Pacific Journal of Information Systems, 24(2), 141-189.
- Leedy, P. & Ormrod, J. (2015). Practical Research: Planning and Design. 11th Ed. New Jersey: Pearson Education International.
- Liphadzi, M., Aigbavboa, C. & Thwala, W. (2015). Relationship between leadership styles and project success in the South Africa construction industry, Procedia Engineering, 123(1), 284-290.
- Likert, R. (1932). A technique for the measurement of attitudes. Archives of Psychology, 140(1), 1-55.
- Long, N., Ogunlana, S., Quang, T. & Lam, K. (2004). Large construction projects in developing countries: a case study from Vietnam. International Journal of Project Management, 22(7), 553-561.
- Mahmood, S. & Shahrukh. (2012). Exploring the Critical Success Factors of Construction Companies of Developing Countries. The International Journal's Research Journal of Social Science & Management, 1(1), 8-14.
- Mavetera, N., Sekhabisa, K., Mavetera, C. & Choga, I. (2015). Factors influencing the success of construction projects by emerging contractors in South Africa: a case of Mahikend area. Corporate Ownership and Control, 13(1), 234-256.
- Men, R. (2014). Internal reputation management: The impact of authentic leadership and transparent communication, Corporate Reputation Review, 17(4), 254-272.
- McNabb, D. E. (2016). Research methods for political science: Quantitative and qualitative approaches. 2nd Ed. New York, USA: Routledge.
- Misic, S. & Radujkovic, M. (2015). Critical drivers of megaprojects success and failure. Procedia Engineering, 122(1), 71-80.
- Montequin, V. R., Cousillas, S. M. & Villanueva, J. (2016). Success factors and failure causes in projects: Analysis of cluster patterns using self-organizing maps, Procedia Computer Science, 100(1), 440-448.
- Niazi, G. A. & Painting, N. (2017). Significant factors causing cost overruns in the construction industry in Afghanistan, Procedia Engineering, 182(1), 510-517.
- Nunnally, J. C. & Bernstein, I. H. (2010). Psychometric theory. New Delhi: Tata McGraw-Hill Ed.
- Odimabo, O. & Oduoza, C. F. (2018). Guidelines to aid project managers in conceptualizing and implementing risk management in building projects, Procedia Manufacturing, 17(1), 515-522.
- Odimabo, O. & Oduoza, C. (2013). Risk Assessment Framework for Building Construction Projects in Developing Countries. International Journal of Construction Engineering and Management, 5(2), 143-154.
- Ojiako, U., Johansen, E. & Greenwood, D. (2008). A qualitative re‐construction of project measurement criteria, Industrial Management & Data Systems, 108(3), 405-417.
- Olayisade, A. & Awolusi, O. D. (2021). The Effect of Leadership Styles on Employee's Productivity in the Nigerian Oil and Gas Industry, Information Management and Business Review, 13(1), 47-64.
- Pannucci, C. J. & Wilkins, E. G. (2010). Identifying and avoiding bias in research. Plastic and reconstructive surgery, 126(2), 619-625.
- Pinto, J. K. & Slevin, D. P. (1988). Critical success factors across the project life cycle: Definitions and measurement techniques, Project Management Journal, 19(3), 67-75.
- Project Management Institute (PMI). (2013). A guide to the project management body of knowledge (PMBOK® Guide), 5th ed. Project Management Institute.
- Rajasekaran, A. G. & Valli, P. (2014). Analysis of the success factors influencing a construction project, International Journal of Engineering & Applied Sciences, 6(1), 21-21.
- Ramlee, N., Tammy, N. J., Noor, R. N., Musir, A. A., Karim, N. A., Chan, H. B. & Nasir, S. R. (2016). Critical success factors for construction project, AIP Conference Proceedings, 1774(1), 1-7.
- Rezek, M. (2013). Leading a cross-cultural workplace. [Online] http://www.chinabusinessreview.com/leading-a-cross-cultural-workplace/ [Accessed 23 Jan. 2019]
- Risath, A. & Siriwardana, C. (2018). Assessment of Critical Success Factors (CSFs) for the deployment of construction risk management practices in Srilanka. International Journal of Civil Engineering, 7(5), 1-12.
- Sanvido, V., Grobler, F., Parfitt, K. & Guvenis, M. (1992). Critical Success Factors for Construction Projects. Journal of Construction Engineering and Management, 118(1), 94-111.
- Saunders, M., Lewis, P. & Thornhill, A. (2012). Research methods for business students. 6th ed. London: Pearson Publishers.
- Saunders, M., Lewis, P. & Thornhill, A. (2016). Research Methods for Business Students. 7th ed. Essex: Pearson Education Ltd.
- Serrador, P. & Pinto, J. K. (2015). Does agile work? — A quantitative analysis of agile project success. International Journal of Project Management, (33)5, 1040-1051.
- Silva, G., Warnakulasooriya, B. & Arachchige, B. (2016). Critical success factors: En route for the success of construction projects, International Journal of Business and Social Science, 7(3), 256-267.
- Tabassi, A. A., Argyropoulou, M., Roufechaei, K. M. & Argyropoulou, R. (2016). Leadership behavior of project managers in sustainable construction projects, Procedia Computer Science, 100(1), 724-730.
- Tengan, C. & Aigbavboa, C. (2017). Level of stakeholder engagement and participation in monitoring and evaluation of construction projects in Ghana, Procedia Engineering, 196(1), 630-637.
- Tesfaye, E., Lemma, T., Berhan, E. & Beshah, B. (2017). Key project planning processes affecting project success. International Journal for Quality Research, 11(1), 159-171.
- Tshik, M. (2015). Critical success factors for infrastructure construction projects in South Africa: project management, and construction. Civil Engineering = Siviele Ingenieurswese, 23(6), 19-24.
- Tsiga, Z., Emes, M. & Smith, A. (2017). Critical success factors for projects in the petroleum industry, Procedia Computer Science, 121, 224-231.
- United Nations. (2018). Least Developed Countries (LDCs) | Economic Analysis & Policy Division. [Online] Available at: https://www.un.org/development/desa/dpad/least-developed-country-category.html [Accessed 23 Dec. 2018].
- Wadongo, B. & Abdel-Kader, M. (2014). Contingency theory, performance management and organizational effectiveness in the third sector: A theoretical framework, Journal of Facilities Management, 63(6), 680-703.
- Williams, T. (2016). Identifying success factors in construction projects: A case study, Project Management Journal 2, 47(1), 97-112.
- Wondimu, P. A., Hailemichael, E., Hosseini, A., Lohne, J., Torp, O. & Laedre, O. (2016). Success factors for early contractor involvement (ECI) in public infrastructure projects, Energy Procedia, 96(1), 845-854.
- Walton, N. (2015). What is research ethics? [Online] Available at: https://researchethics.ca/what-is-researchethics/ [Accessed: 10 Jan. 2019].
- Weiers, R. (2011). Introduction to business statistics. 7th ed. Mason, OH: Cengage.
- World Bank. (2018). Projects & Programs_Democratic Republic of Congo. [Online] Available at: http://www.worldbank.org/en/country/drc/projects [Accessed 21 Dec. 2018].
- Yujin, K. (2011). The pilot study in qualitative inquiry. Qualitative Social Work, 10(2), 190-206.
- Yong, Y. & Mustaffa, N. (2013). Critical success factors for Malaysian construction projects: An empirical assessment, Construction Management & Economics, 31(9), 959-978.
- Zidane, Y., Johansen, A., Andersen, B. & Hoseini, E. (2015). Time thieves and bottlenecks in the Norwegian construction projects, Procedia Economics and Finance, 21(1), 486-493.
- Nzekwe, J., Oledelo, E. & Emoh, F. (2015). Project Failure as a Reoccuring Issue in Developing Countries: Focus on Anambra State, South-East Nigeria. [Online] Eajournals.org. Available at: http://www.eajournals.org/wp-content/uploads/Project-Failure-As-A-Reoccurring-Issue-InDeveloping-Countries.pdf [Accessed 28 Mar. 2019].
- Zikmund, W. G. (2010). Business research methods. 8th ed. Mason, OH: Cengage.
Downloads
No downloads have been recorded for this article yet. Figures appear here once readers begin downloading the full text.
How to Cite
Share this article
License
Copyright (c) 2021 Adrien Fariala, Olawumi Dele Awolusi (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.
Author (s) should affirm that the material has not been published previously. It has not been submitted and it is not under consideration by any other journal. At the same time author (s) need to execute a publication permission agreement to assume the responsibility of the submitted content and any omissions and errors therein. After submission of revised paper in the light of suggestions of the reviewers, the editorial team edits and formats manuscripts to bring uniformity and standardization in published material.
This work will be licensed under Creative Commons Attribution 4.0 International (CC BY 4.0) and under condition of the license, users are free to read, copy, remix, transform, redistribute, download, print, search or link to the full texts of articles and even build upon their work as long as they credit the author for the original work. Moreover, as per journal policy author (s) hold and retain copyrights without any restrictions.
Keywords
- Critical Success Factors Search this journal for Critical Success Factors (opens in a new tab)
- Developing Country Search this journal for Developing Country (opens in a new tab)
- Least Developed Countries Search this journal for Least Developed Countries (opens in a new tab)
- Project Success Search this journal for Project Success (opens in a new tab)
- Quality Search this journal for Quality (opens in a new tab)
Section
Published in
Vol. 13 No. 2(I) (2021)
CSR Disclosure, Project Success & Cybersecurity
View issue contents
Published
Submissions
Have research to publish? Information Management and Business Review welcomes submissions.
Make a Submission